Ducts are an important part of the ventilation and air conditioning system. Most of them are made of ducting equipment (such as the ducting line). However, due to a variety of reasons, may lead to pipeline processing equipment processing problems.
1. Unqualified processing materials
(1) performance: the surface of the sheet is not smooth and the thickness is not even. There are obvious indentations, cracks, blisters, crusts and rust. The air duct plane sinks, the two sides protrude outward, the deformation is obvious.
(2) influence: during operation, the air duct leaks, the air conditioning load increases, and the life and performance of the wind are affected.
(3) reason: the material is unqualified and cannot meet the needs of making air ducts.
(4) measures: before using the air duct processing equipment to make the air duct, the factory qualification certificate, material quality certificate and appearance thickness of the material should be checked first to ensure the availability of the material.
2. Air duct production line Angle and elbow Angle are not allowed
(1) performance: the rectangular air duct is two relative planes, and the two end faces are not parallel; The corners are not straight; The diagonal is not equal; Loose lips.
(2) influence: it will make the air duct even relay is not uniform, the air duct is not straight after installation, flange gasket is not tight, air leakage system, air conditioning load loss, shorten the service life.
(3) reason: circuit board blanking is not accurate; The air ducts are two or two parallel and the length and width of the opposite side panels are not equal.
(4) measures: when launched, the strict control of the paper Angle. The length, width and diagonal of each sheet of paper should be controlled so that the deviation is within the allowed range; The paper should be cut and air duct opposite the two pieces of cardboard coincidence, to check the dimensional accuracy.
Therefore, in order to produce practical, durable and high-quality piping, adequate preparation and operational preparation before and after piping equipment operation is required to ensure complete safety.Ducts are an important part of the ventilation and air conditioning system. Most of them are made of ducting equipment (such as the ducting line). However, due to a variety of reasons, may lead to pipeline processing equipment processing problems.
1. Unqualified processing materials
(1) performance: the surface of the sheet is not smooth and the thickness is not even. There are obvious indentations, cracks, blisters, crusts and rust. The air duct plane sinks, the two sides protrude outward, the deformation is obvious.
(2) influence: during operation, the air duct leaks, the air conditioning load increases, and the life and performance of the wind are affected.
(3) reason: the material is unqualified and cannot meet the needs of making air ducts.
(4) measures: before using the air duct processing equipment to make the air duct, the factory qualification certificate, material quality certificate and appearance thickness of the material should be checked first to ensure the availability of the material.
2. Air duct production line Angle and elbow Angle are not allowed
(1) performance: the rectangular air duct is two relative planes, and the two end faces are not parallel; The corners are not straight; The diagonal is not equal; Loose lips.
(2) influence: it will make the air duct even relay is not uniform, the air duct is not straight after installation, flange gasket is not tight, air leakage system, air conditioning load loss, shorten the service life.
(3) reason: circuit board blanking is not accurate; The air ducts are two or two parallel and the length and width of the opposite side panels are not equal.
(4) measures: when launched, the strict control of the paper Angle. The length, width and diagonal of each sheet of paper should be controlled so that the deviation is within the allowed range; The paper should be cut and air duct opposite the two pieces of cardboard coincidence, to check the dimensional accuracy.
Therefore, in order to produce practical, durable and high-quality piping, adequate preparation and operational preparation before and after piping equipment operation is required to ensure complete safety.